| Charmont | ||
Chemical water treatment for a new 660MWe system in the Ledvice power plant. |
Erection and connection of gas and nitrogen skids. |
Engineering supervision for the erection of the auxiliary boiler house in power plant Maritza, Bulgaria - two Loos ZFR-X 50,000 x 18bar boilers with superheaters and LFO-firing. |
Large-volume fire-tube Loos 25MV boiler in the Modrany heating plant, Prague. |
Delivery and erection of cogeneration unit with Kawasaki gas turbine at the Carlsbad heating utility. |
|
| DylanGroup | ||
DylanGroup has the largest range of steel piping materials in the world, which undergo stringent checks or additional testing by the company’s quality department. |
DylanGroup provides thousands of tonnes of pipes, fittings, flanges, bar and valves, as well as piping packages. |
DylanGroup offers piping products in carbon-steel and Cr-Mo steel grades, which meet ASME and EN/DIN standards. |
DylanGroup has offices in Europe, the Middle East and the Far East, as well as representation in Eastern Europe and North and South America. |
||