The Gas Turbine Industry’s Best Kept Secret: First-Stage Nozzle Replacement Coupons
14 September 2007The constant erosion of first-stage nozzle trailing edges is one of the greatest challenges in maintaining power generation efficiency because it significantly shortens the turbine's operating time and the nozzle's lifespan.
In this free white paper we explore how replacement trailing edge coupons make it possible to remove and replace the eroded sections of first-stage nozzles, reducing costs and increasing lifespan.
Available Downloads
-
The Gas Turbine Industry’s Best Kept Secret: First-Stage Nozzle Replacement Coupons
Download