Home > Industry Projects > Combined-Cycle Gas Turbine (CCGT) > GE Combined-Cycle Plant
Specifications - GE Combined-Cycle Plant, Arcos De La Frontera, Spain
| Key Data |
| Design validation testing | September 2005 |
| Start of operation | December 2005 |
| Output | 800MW |
| Plant type | Combined-cycle power plant |
| Location | Group III of the Arcos de la Frontera, Cadiz province, Spain |
| Estimated investment | Estimated at €800m (total) |
| Key Players |
| Plant owner | Iberdrola Generacion S.A. |
| Plant construction | General Electric |
| Plant Details |
| Gas Turbines | 209FB 50Hz combined-cycle system with two Frame 9FB gas turbines with Dry Low NOx2+ combustion systems |
| Steam units | One GE D11 steam turbine |
| Other equipment | Three 330H generators and two heat recovery steam generators. |
| Efficiency | 58% combined-cycle |
| Emissions | Alongside carbon dioxide emissions, NOx emissions are limited to 25 parts per million and SO2 levels are negligible. |
| Fuel | Natural gas |