Jump to page content Accessibility
News, views and contacts from the global Power industry
Login to power-technology.com Log in or Register
  • Home
  • Products & Services
  • Company A - Z
  • Projects
  • Features
  • Videos
  • White Papers
  • News
  • Events
  • Advertise With Us
Industry Projects | Projects by Region | Projects by Category | Archived Projects | Project Gallery
 

Deriner Dam and Hydroelectric Power Plant (HEPP), Turkey



The Deriner double-curvature concrete arch dam is located on the Coruh River.


  • The Deriner double-curvature concrete arch dam is located on the Coruh River.

  • The powerhouse is located underground on the right bank of the river.

  • Construction on the 670MW powerhouse near the Deriner dam will be fully...

  • The powerhouse will be 20m wide, 126m long and 45m high.

Back to Project Details



Related Projects

Samalayuca II CCGT Plant, Chihuahua
The Samalayuca II CCGT plant is now generating 700MW using dry...

Manjung Coal-Fired Power Plant, Perak
The Manjung coal-fired power plant, sponsored by Tenaga Janamanjung,...

Taichung Coal-Fired
Taipower plans to replace the generator setups in the 2,200MW Taichung...

Subiya Oil-Fired Power Plant
Stage one of the Subiya oil-fired power plant in Kuwait was completed...

Yangcheng Coal-Fired Power Plant, Shanxi Province
Yangcheng International Power Company is now operating its 2,100MW (six...

See all projects


Follow Us:
Twitter Twitter    Facebook Facebook   
Contact us
Advertise with us
Terms and conditions
Privacy
Links
Newsletter sign up
Online magazine sign up

power-technology.com is a product of Net Resources International. Copyright 2012 Net Resources International, a trading division of SPG Media Limited.