The Clipper Windpower design needs only low maintenance.
-
Clipper Windpower's Turbine Control Unit monitors and controls performance. -
Silver Star 1 will add 60MW of wind power to the US grid. -
The Clipper Windpower design needs only low maintenance. -
The $100m project is owned 85% by BP Alternative Energy and 15%... -
Silver Star 1 is expected go online in the first quarter of 2008. -
Silver Star 1 will supply around 24,000 homes.