Sump Wall Form Construction (OPA).
-
Thorold Gas Turbine Full Speed No Load Test (OPA). -
Thorold Gas Turbine Casing Inspection (OPA). -
Intake Sump Slab Rebar (OPA). -
Main Duct Bank Installation (OPA). -
Sump Wall Form Construction (OPA).