Jump to page content Accessibility
News, views and contacts from the global Power industry
Login to power-technology.com Log in or Register
  • Home
  • Products & Services
  • Company A - Z
  • Projects
  • Features
  • Videos
  • White Papers
  • News
  • Events
  • Advertise With Us
Industry Projects | Projects by Region | Projects by Category | Archived Projects | Project Gallery
 

Walsum Unit 10, Duisburg, Germany



The hard-fired coal plant will cost about €800m, and should be open in 2010.


  • The 750MW power plant at Duisburg-Walsum will produce various forms of energy.

  • Besides electricity, Unit 10 will provide district heating, process steam and...

  • The hard-fired coal plant will cost about €800m, and should be open in 2010.

  • The Duisburg-Walsum plant will generate jobs for the Ruhr district.

  • Hitachi Power Europe GmbH was contracted for turnkey construction.

  • Steag and EVN started construction ahead of schedule.

  • Air pollution control systems include flue gas desulfurisation (FGD) and NOx...

Back to Project Details



Related Projects

Yangcheng Coal-Fired Power Plant
Yangcheng International Power Company is now operating its 2,100MW (6...

Yonghungdo Power Plant
The $2.5bn 1,600MW Yonghungdo plant has been completed on the...

Subiya Oil-Fired Power Plant
Stage one of the Subiya oil-fired power plant in Kuwait was completed...

Taichung Coal-Fired
Taipower plans to replace the generator setups in the 2,200MW Taichung...

Manjung Coal-Fired Power Plant
The Manjung coal-fired power plant in Malaysia is now producing up to...

See all projects


Follow Us:
Twitter Twitter   
Contact us
Advertise with us
Terms and conditions
Privacy
Links
Newsletter sign up
Online magazine sign up

power-technology.com is a product of Net Resources International. Copyright 2011 Net Resources International, a trading division of SPG Media Limited.