PIE Supplies PIE Cave with Powered Remote Manipulator
SA Robotics has won a contract to deliver a powered remote manipulator (PRM) and control...
SA Robotics is providing a Pre-Conceptual Design Report for CH2MHILL Plateau Remediation’s small container underwater-loading system at K-Basin, Richland, WA. The report will be developed under the assumption that the system will operate within the existing K-West Basin and be operated by personnel at a level 20ft 9in above the equipment.
The concept shall be developed with the idea that the canister will be submerged underwater to overcome the static water head to fill the small container. Design documentation will be provided detailing the final configuration of the pre-concept design for the small container underwater-loading system.
SA Robotics has won a contract to deliver a powered remote manipulator (PRM) and control...
SA Robotics is pleased to have started providing the services and equipment required to remove...
SA Robotics is pleased to have started the design, manufacture and works testing of a...