Lufubu 1 HPP is a 132MW hydro power project. It is planned on Lufubu river/basin in Northern, Zambia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in multiple phases. The project construction is likely to commence in 2025 and is expected to enter into commercial operation in 2027. Buy the profile here.
Description
The project is being developed and currently owned by LPC Lufubu Power.
The hydro reservoir capacity is planned to be 720 million cubic meter. The gross head of the project will be 146m. The penstock length will be 2,600m. The penstock diameter will be 4.2m.
Lufubu 1 HPP (Unit-I) consists of 1 unit of francis turbine with 66MW nameplate capacity.
Lufubu 1 HPP (Unit-II (Expansion)) consists of 1 unit of francis turbine with 66MW nameplate capacity.
The nameplate capacity of electric generator(s) to be installed at the Lufubu 1 HPP (Unit-I) site is 76.5 MVA.
The nameplate capacity of electric generator(s) to be installed at the Lufubu 1 HPP (Unit-II (Expansion)) site is 76.5 MVA.
Development status
The project construction is expected to commence from 2025. Subsequent to that it will enter into commercial operation by 2027.
For more details on Lufubu 1 HPP, buy the profile here.