Power Technology | Energy News and Market Analysis is using cookies

We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.

ContinueLearn More X
DOWNLOAD WHITEPAPER

Condition Assessment and Environmental Ranking of Weathered T&D Structures and Equipment

This free whitepaper, published by Induron, explores the requirements and challenges of creating a working maintenance painting programme for electric utilities to protect transmission and distribution assets.

Utilising a full survey of the environmental corrosion potential, the substrate conditions, and the priorities of the owner, normally resulting in specifications for one-coat systems or minimal sealing / priming, after minimal (SSPC-SP2) surface preparation (maximum SSPC-SP3), Induron explores the evaluation and testing process for coatings.

Please download this free whitepaper to find out more.



Download to find out more.

Close
Close
Close

Go Top