Adlerskaya Power Plant is a 360MW gas fired power project. It is located in Krasnodar Krai, Russia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in January 2013.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 360 | 360 | – | Active | Krasnodar Krai, Russia |
---|
Description
The project is currently owned by OGK-2 with a stake of 100%.
It is a CCGT with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Diesel.
The project generated 2,227,000MWh of electricity.
Development Status
The project got commissioned in January 2013.
Contractors Involved
Mosenergo was selected to render EPC services for the gas fired power project.
Adlerskaya Power Plant (Adlerskaya Power Plant Block I) is equipped with Ansaldo Energia gas turbines. The phase consists of 2 gas turbines, each with 66MW nameplate capacity.
Adlerskaya Power Plant (Adlerskaya Power Plant Block I) is equipped with Kaluga Turbine Works steam turbine. The phase consists of 1 steam turbine with 48MW nameplate capacity.
Adlerskaya Power Plant (Adlerskaya Power Plant Block II) is equipped with Ansaldo Energia gas turbines. The phase consists of 2 gas turbines, each with 66MW nameplate capacity.
Adlerskaya Power Plant (Adlerskaya Power Plant Block II) is equipped with Kaluga Turbine Works steam turbine. The phase consists of 1 steam turbine with 48MW nameplate capacity.
Electrosila supplied electric generator for the Adlerskaya Power Plant (Adlerskaya Power Plant Block I).
Ansaldo Energia supplied electric generator for the Adlerskaya Power Plant (Adlerskaya Power Plant Block I).
Ansaldo Energia supplied electric generator for the Adlerskaya Power Plant (Adlerskaya Power Plant Block II).
Electrosila supplied electric generator for the Adlerskaya Power Plant (Adlerskaya Power Plant Block II).
Podolsk Machine-Building Plant ZIO supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.