Agios Nikolaos Cogeneration Plant is a 334MW gas fired power project. It is located in Central Greece, Greece. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in May 2008.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 334 | 334 | – | Active | Central Greece, Greece |
---|
Description
The project is currently owned by Protergia with a stake of 100%.
It is a CCGT with Cogen power plant that is used for Baseload.
The project cost is $336.299m.
Development Status
The project got commissioned in May 2008.
Contractors Involved
Metka was selected to render EPC services for the gas fired power project.
The Gas fired project have been supplied by GE Power and Siemens.
The electric generators for the project were procured from GE Power and Siemens.
Metka is the O&M contractor for thermal power project, commencing from the year 2008.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.