Agus I is an 80MW hydro power project. It is located on Agus river/basin in Autonomous Region in Muslim Mindanao, Philippines. The project is currently active. It has been developed in single phase. The project construction commenced in 1979 and subsequently entered into commercial operation in 1992.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 80 | 80 | – | Active | Autonomous Region in Muslim Mindanao, Philippines |
---|
Description
The project is currently owned by National Power.
Agus I is a run-of-river project. The net head of the project is 56.4m.
Development Status
The project construction commenced in 1979 and subsequently entered into commercial operation in 1992.
Contractors Involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 2 turbines, each with 40MW nameplate capacity.
Andritz Hydro supplied electric generator(s) for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.