Alon Tavor Combined Cycle Power Plant is a 373MW oil fired power project. It is located in North, Israel. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in December 2008.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 373 | 373 | – | Active | North, Israel |
---|
Description
The project is currently owned by The Israel Electric.
It is a Combined Cycle Gas Turbine (CCGT) power plant.
The project cost is $301.757m.
Development Status
The project got commissioned in December 2008.
Contractors Involved
GE Power was selected as the turbine supplier for the Oil fired project. The Oil fired project consists of 1 steam turbine.
GE Power was selected as the turbine supplier for the Oil fired project. The company provided 1 unit of 9FA gas turbine.
GE Power is the O&M contractor for thermal power project for a period of 15 years.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.