Antonio Maceo Power Plant is a 400MW oil fired power project. It is located in Santiago de Cuba, Cuba. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1975.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 400 400 Active Santiago de Cuba, Cuba

Description

The project is currently owned by Union Electrica de Cuba with a stake of 100%.

It is a Steam Turbine power plant. The fuel is procured from Russian Fuel Oil.

Development Status

The project got commissioned in 1975.

Contractors Involved

Technopromexport was selected to render EPC services for the oil fired power project.

Power Machines was selected as the turbine supplier for thermal power project. The project consists of 4 units of TVF-100-3600T turbines, each with 100MW nameplate capacity.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.