Avtovskaya CHP-15 is a 313MW gas fired power project. It is located in Saint Petersburg, Russia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 1956.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 313 | 313 | – | Active | Saint Petersburg, Russia |
---|
Description
Gazprom Energoholding and Fortum Power and Heat are currently owning the project having ownership stake of 51.79% and 29.45% respectively.
It is a Steam Turbine with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Fuel Oil.
Development Status
The project got commissioned in December 1956.
Contractors Involved
Avtovskaya CHP-15 (Avtovskaya CHP-15 unit I) is equipped with Ural Turbine Works T-22-90 steam turbine. The phase consists of 1 steam turbine with 22MW nameplate capacity.
Avtovskaya CHP-15 (Avtovskaya CHP-15 unit II) is equipped with Ural Turbine Works T-20-90 steam turbine. The phase consists of 1 steam turbine with 20MW nameplate capacity.
Avtovskaya CHP-15 (Avtovskaya CHP-15 unit III) is equipped with Ural Turbine Works T-22-90 steam turbine. The phase consists of 1 steam turbine with 22MW nameplate capacity.
Avtovskaya CHP-15 (Avtovskaya CHP-15 unit IV) is equipped with Ural Turbine Works T-100/120-130-2 steam turbine. The phase consists of 1 steam turbine with 100MW nameplate capacity.
Avtovskaya CHP-15 (Avtovskaya CHP-15 unit V) is equipped with Ural Turbine Works T-97/117-130-3 steam turbine. The phase consists of 1 steam turbine with 97MW nameplate capacity.
Avtovskaya CHP-15 (Avtovskaya CHP-15 unit VI) is equipped with Ural Turbine Works T-22-90 steam turbine. The phase consists of 1 steam turbine with 22MW nameplate capacity.
Avtovskaya CHP-15 (Avtovskaya CHP-15 unit VII) is equipped with Ural Turbine Works PT-30-8,8 steam turbine. The phase consists of 1 steam turbine with 30MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.