Barilla Solar PV Park is a 30MW solar PV power project. It is located in Texas, the US. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in September 2014.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 30 | 30 | – | Active | Texas, the US | First Solar |
---|
Description
The project was developed by First Solar and is currently owned by Leeward Renewable Energy.
Barilla Solar PV Park is a ground-mounted solar project which is spread over an area of 200 acres.
The project supplies enough clean energy to power 2,000 households.
Development Status
The project got commissioned in September 2014.
Contractors Involved
First Solar was selected as the supplier of PV modules for the project.
About First Solar
First Solar Inc (First Solar) is a provider of solar photovoltaic (PV) systems. It designs, manufactures and sells PV solar modules. The company produces solar systems using cadmium telluride technology. First Solar also offers solar PV power systems, and operations and maintenance services to system owners; and energy storage solutions and algorithms to design and simulate the optimal dispatch of a system. The company serves utilities, commercial and industrial companies, independent power producers, and other system owners in Asia Pacific, Europe, the Middle East, Africa and North America. It has solar module manufacturing facilities in the US, Malaysia, Germany and Vietnam. First Solar is headquartered in Tempe, Arizona, the US.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.