Blagoveschenskaya (Annunciation) Cogeneration Plant is a 400MW coal fired power project. It is located in Amur, Russia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1982.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 400 | 400 | – | Active | Amur, Russia | Blagoveshchenskaya CHPP |
---|
Description
The project is developed and owned by Blagoveshchenskaya CHPP.
It is a Steam Turbine with Cogen power plant. The fuel is procured from Raichihinsk, Erkovetskogo and Kharanor Coal Fields.
The project cost is $282.12m.
Development Status
The project got commissioned in 1982.
Contractors Involved
Power Machines was selected to render EPC services for the Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Phase II).
Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Phase II) is equipped with Power Machines steam turbine. The phase consists of 1 steam turbine with 120MW nameplate capacity.
Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Unit I) is equipped with Leningradsky Metallichesky Zavod steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.
Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Unit II) is equipped with Ural Turbine Works steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.
Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Unit III) is equipped with Ural Turbine Works T-110-120/130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.
Power Machines supplied electric generator for the Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Phase II).
NPO Elsib supplied electric generator for the Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Unit I).
NPO Elsib supplied electric generator for the Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Unit II).
NPO Elsib supplied electric generator for the Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Unit III).
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Blagoveschenskaya (Annunciation) Cogeneration Plant (Blagoveschenskaya (Annunciation) Cogeneration Plant Phase II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.