Brignoles Biomass Power Plant is a 21.5MW biopower project. It is located in Provence-Alpes-Cote dAzur, France. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in March 2016.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 21.5 | 21.5 | – | Active | Provence-Alpes-Cote dAzur, France | Inova Var Biomasse |
---|
Description
The project is developed and owned by Inova Var Biomasse.
The project generates 168GWh electricity and supplies enough clean energy to power 42,000 households. The project cost is $99.216m.
Brignoles Biomass Power Plant is a combined heat and power (CHP) project. Agricultural by-product and wood by-product are used as a feedstock to power the project.
The project consists of 1 turbine with 21.5MW nameplate capacity.
Development Status
The project got commissioned in March 2016.
Contractors Involved
Leroux et Lotz Technologies supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.