C.H. Millares II is a 68MW hydro power project. It is located on Jucar river/basin in Valencian Community, Spain. The project is currently active. It has been developed in single phase. The project construction commenced in 1998 and subsequently entered into commercial operation in 2003.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 68 68 Active Valencian Community, Spain

Description

The project is currently owned by Iberdrola.

C.H. Millares II is a reservoir based project. The net head of the project is 123m. The project generated 240 GWh of electricity. The project cost is $83.701m.

The project has 2 electric generators installed at the site. The generator capacity is 35.3 MVA.

Development Status

The project construction commenced in 1998 and subsequently entered into commercial operation in 2003.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.