Chirkeiskaya is a 1,000MW hydro power project. It is located on Sulak river/basin in Dagestan, Russia. The project is currently active. It has been developed in single phase. The project construction commenced in 1964 and subsequently entered into commercial operation in 1974.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 1,000 | 1,000 | – | Active | Dagestan, Russia |
---|
Description
The project is currently owned by RusHydro with a stake of 100%.
Chirkeiskaya is a reservoir based project. The hydro reservoir capacity is 2.78 million cubic meter. The net head of the project is 170m. The project generated 2,470 GWh of electricity. The project cost is $283m.
Development Status
The project construction commenced in 1964 and subsequently entered into commercial operation in 1974.
Contractors Involved
Power Machines was selected as the turbine supplier for the hydro power project. The company provided 4 units of francis turbines, each with 250MW nameplate capacity.
Uralelectrotyazhmash supplied electric generator(s) for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.