Cijara M. Izda. is a 51.7MW hydro power project. It is located on Guadiana river/basin in Spain. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1956.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 51.7 51.7 Active Spain Endesa Cogeneracion Y Renovables (Ecyr)

Description

The project was developed by Endesa Cogeneracion Y Renovables (Ecyr) and is currently owned by Endesa Generacion with a stake of 100%.

Cijara M. Izda. is a reservoir based project.

The hydro power project consists of 2 turbines, each with 17.17MW nameplate capacity.

The hydro power project consists of 1 turbine with 17.36MW nameplate capacity.

The project has 3 electric generators installed at the site.

Development Status

The project got commissioned in 1956.

Power Purchase Agreement

The power generated from the project is sold to ENDESA Distribucion Electrica under a power purchase agreement.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.