Clahane (Pallas) is a 53.8MW onshore wind power project. It is located in Kerry, Ireland. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2008.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 53.8 53.8 Active Kerry, Ireland

Description

The project is currently owned by The Renewables Infrastructure Group with a stake of 100%.

Development Status

The project is currently active. The project got commissioned in 2008.

Contractors Involved

Clahane (Pallas) (Clahane I) is equipped with Enercon E-70 turbines. The phase consists of 20 turbines with 2MW nameplate capacity.

Clahane (Pallas) (Clahane II) is equipped with Enercon E-70 / 2,300 kW turbines. The phase consists of 6 turbines with 2.3MW nameplate capacity.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.