Daming County New Energy Biomass Cogeneration Plant is a 24MW biopower project. It is planned in Hebei, China. The project is currently in announced stage. It will be developed in single phase. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in 2025.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 24 | – | 24 | Announced | Hebei, China | JiangSu Jin Tong Ling Fluid Machinery Technology |
---|
Description
The project is being developed and currently owned by JiangSu Jin Tong Ling Fluid Machinery Technology.
The project cost is expected to be around $86.891m.
Daming County New Energy Biomass Cogeneration Plant is a combined heat and power (CHP) project. Agricultural by-product will be used as a feedstock to power the project.
The project consists of 2 turbines, each with 12MW nameplate capacity.
Development Status
The project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by 2025.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.