Dlouhe Strane I is a 650MW hydro power project. It is located on Divoka Desna river/basin in Czech Republic. The project is currently active. It has been developed in multiple phases. The project construction commenced in 1978 and subsequently entered into commercial operation in 1996.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 650 | 650 | – | Active | Czech Republic |
---|
Description
The project is currently owned by CEZ.
Dlouhe Strane I is a pumped storage project. The hydro reservoir capacity is 2.72 million cubic meter. The gross head of the project is 510.7m.
Development Status
The project construction commenced in 1978 and subsequently entered into commercial operation in 1996.
Contractors Involved
CKD Blansko Holding was selected as the turbine supplier for the hydro power project. The project consists of 2 units of Francis turbines, each with 325MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.