Forsse is a 59MW hydro power project. It is located on Faxalven river/basin in Vasternorrland, Sweden. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1968.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 59 | 59 | – | Active | Vasternorrland, Sweden |
---|
Description
The project is currently owned by Uniper with a stake of 100%.
Forsse is a run-of-river project. The gross head of the project is 20m. The project generated 210 GWh of electricity.
The hydro power project consists of 2 turbines.
Development Status
The project got commissioned in 1968.
Contractors Involved
GE Renewable Energy supplied 2 electric generators for the project. The generator capacity is 35 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.