Guijo De Granadilla is a 52.8MW hydro power project. It is located on Alagon river/basin in Extremadura, Spain. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1982.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 52.8 | 52.8 | – | Active | Extremadura, Spain | Iberdrola Renovables |
---|
Description
The project was developed by Iberdrola Renovables and is currently owned by Iberdrola with a stake of 100%.
Guijo De Granadilla is a reservoir based project. The hydro reservoir capacity is 13 million cubic meter.
The hydro power project consists of 2 turbines, each with 26.4MW nameplate capacity.
Development Status
The project got commissioned in 1982.
Power Purchase Agreement
The power generated from the project is sold to Red Electrica De Espana under a power purchase agreement.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.