HO Clarke Generating Station is a 363MW gas fired power project. It is located in Texas, the US. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in April 2021.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 363 363 Active Texas, the US WattBridge Energy

Description

The project is developed and owned by WattBridge Energy.

It is a Gas Turbine power plant that is used for Peakload.

Development Status

The project got commissioned in April 2021.

Contractors Involved

ProEnergy Services was selected to render EPC services for the gas fired power project.

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 6 units of LM6000-PC™ – 60Hz gas turbines, each with 60.5MW nameplate capacity.

ProEnergy Services is the O&M contractor for thermal power project.

About WattBridge Energy

WattBridge Energy LLC (WattBridge Energy) is a electric generating company that provides power generation and also distribution services. WattBridge Energy is headquartered in the US.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.