Ho Tam Bo Floating Solar Power Plant is a 35MW solar PV power project. It is located in Ba Ria-Vung Tau, Vietnam. The project is currently active. It has been developed in single phase. The project construction commenced in 2020 and subsequently entered into commercial operation in December 2020.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Solar PV 35 35 Active Ba Ria-Vung Tau, Vietnam

Description

Ho Tam Bo Floating Solar Power Plant is a floating solar project.

The project cost is $33.425m.

Development Status

The project construction commenced in 2020 and subsequently entered into commercial operation in December 2020.

Contractors Involved

LONGi Solar Technology was selected as the supplier of PV modules for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.