Hsinta (Xingda) Combined Cycle Power Plant is a 2,225.95MW gas fired power project. It is located in Kaohsiung, Taiwan. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1999.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 2,225.95 | 2,225.95 | – | Active | Kaohsiung, Taiwan |
---|
Description
The project is currently owned by Taiwan Power.
It is a combined cycle gas turbine (ccgt) power plant.
Development Status
The project got commissioned in 1999.
Contractors Involved
Siemens was selected as the turbine supplier for the Gas fired project. The company provided 15 units of SGT6-2000E gas turbines.
Siemens was selected as the turbine supplier for the Gas fired project. The company supplied SST6-4000 model steam turbines for the project.
Siemens supplied Air-Cooled electric generator for the project.
Siemens supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.