Hyuga City Biomass Power Plant is an 18MW biopower project. It is located in Miyazaki, Japan. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2015.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 18 18 Active Miyazaki, Japan

Description

The project is currently owned by Chugoku Mokuzai.

The project cost is $77.214m.

The process of combustion has been adopted in this project to release the stored energy from the feed. Wood waste which is a kind of wood by-product is used as a feedstock to power the project.

The project consists of 1 turbine with 18MW nameplate capacity.

Development Status

The project got commissioned in 2015.

Contractors Involved

Takuma supplied steam boiler for the project. The boiler installed at the site has a capacity of 75TPH. The temperature witnessed inside the boiler is around 460°C. The steam is pressurized inside the boiler at 870.22psig.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.