Hyundai Green Gas Fired Power Plant is a 400MW gas fired power project. It is located in South Chungcheong, South Korea. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in January 2011.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 400 400 Active South Chungcheong, South Korea Hyundai Green Power

Description

The project is developed and owned by Hyundai Green Power.

It is a Steam Turbine with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is blast furnace gas. In case of shortage of blast furnace gas the plant can also run on Coke Oven Gas.

The project cost is $296.496m.

Development Status

The project got commissioned in January 2011.

Contractors Involved

Siemens was selected as the turbine supplier for the Gas fired project. The company provided 4 units of SST-900 steam turbines, each with 100MW nameplate capacity.

Siemens supplied SGen 6-100A-2P electric generator for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.