Jebel Ali L Power Station is a 2,362MW gas fired power project. It is located in Dubai, United Arab Emirates. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2005.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 2,362 | 2,362 | – | Active | Dubai, United Arab Emirates |
---|
Description
The project is currently owned by Dubai Electricity and Water Authority.
It is a ccgt with cogen power plant.
Development Status
The project got commissioned in 2005.
Contractors Involved
Fisia Italimpianti was selected to render EPC services for the Jebel Ali L Power Station (Jebel Ali L Power Station Block II) project. Hyundai Engineering & Construction was selected to render EPC services for the Jebel Ali L Power Station (Jebel Ali L Power Station Block II) project. Mitsubishi was selected to render EPC services for the Jebel Ali L Power Station (Jebel Ali L Power Station Block I) project. Toshiba Energy Systems and Solutions was selected to render EPC services for the Jebel Ali L Power Station (Jebel Ali L Power Station Block I) project.
Jebel Ali L Power Station (Jebel Ali L Power Station Block I) is equipped with GE Power gas turbines. The Gas fired phase consists 3 gas turbines.
Jebel Ali L Power Station (Jebel Ali L Power Station Block I) is equipped with Toshiba Energy Systems and Solutions Back Pressure steam turbines. The phase consists of 2 steam turbines.
Jebel Ali L Power Station (Jebel Ali L Power Station Block II) is equipped with GE Power Condensing Type steam turbines. The phase consists of 2 steam turbines with 220MW nameplate capacity.
Jebel Ali L Power Station (Jebel Ali L Power Station Block II) is equipped with Siemens SGT6-4000F gas turbines. The phase consists of 4 gas turbines.
Siemens Heat Transfer Technology supplied steam boiler for the Jebel Ali L Power Station (Jebel Ali L Power Station Block II).
Siemens is the O&M contractor for the Jebel Ali L Power Station (Jebel Ali L Power Station Block II) for a period of 20 years.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.