Jinzhushan Thermal Power Plant is a 2,550MW coal fired power project. It is located in Hunan, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1972.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 2,550 | 1,950 | – | Active | Hunan, China |
---|
Description
The project is currently owned by Datang Huayin Electric Power.
It is a steam turbine power plant that is used for Baseload.
Development Status
The project got commissioned in 1972.
Contractors Involved
Jinzhushan Thermal Power Plant (Jinzhushan Thermal Power Plant Unit IV) is equipped with Shanghai Turbine steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Jinzhushan Thermal Power Plant (Jinzhushan Thermal Power Plant Unit VI) is equipped with Shanghai Turbine steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Shanghai Boiler Works supplied steam boiler for the Jinzhushan Thermal Power Plant (Jinzhushan Thermal Power Plant Unit III).
Shanghai Boiler Works supplied steam boiler for the Jinzhushan Thermal Power Plant (Jinzhushan Thermal Power Plant Unit IV).
Shanghai Boiler Works supplied steam boiler for the Jinzhushan Thermal Power Plant (Jinzhushan Thermal Power Plant Unit V).
Shanghai Boiler Works supplied steam boiler for the Jinzhushan Thermal Power Plant (Jinzhushan Thermal Power Plant Unit VI).
Dongfang Boiler Group supplied steam boiler for the Jinzhushan Thermal Power Plant (Jinzhushan Thermal Power Plant-II Unit I).
Dongfang Boiler Group supplied steam boiler for the Jinzhushan Thermal Power Plant (Jinzhushan Thermal Power Plant-II Unit II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.