Jorethang Loop is a 96MW hydro power project. It is located on Rangit river/basin in Sikkim, India. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2015.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 96 96 Active Sikkim, India Dans Energy

Description

The project is developed and owned by Dans Energy.

Jorethang Loop is a run-of-river project. The hydro reservoir capacity is 0.45 million cubic meter. The gross head and net head of the project are 86m and 74m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 1 in number. The penstock length is 172.6m. The penstock diameter is 6m. The project generated 444 GWh of electricity. The project cost is $157.164m.

Development Status

The project got commissioned in 2015.

Content from our partners
Green investment: What gives Scotland multiple advantages
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration

Contractors Involved

GE Power India was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 48MW nameplate capacity.

GE Power India supplied 2 electric generators for the project.

About Dans Energy

Dans Energy Pvt. Ltd. is an independent power producer focusing on the development of hydro-power projects in the State of Sikkim. Currently, the company engaged in the development of proposed Jorethang Loop Hydroelectric project located in the Namchi sub-division of the West District in the state of Sikkim, India.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU