Juba Power Plant is a 318.43MW oil fired power project. It is located in Al Riyadh, Saudi Arabia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1988.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 318.43 318.43 Active Al Riyadh, Saudi Arabia

Description

The project is currently owned by Saudi Electricity with a stake of 100%.

It is a Gas Turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is crude oil. In case of shortage of crude oil the plant can also run on Diesel.

Development Status

The project got commissioned in 1988.

Power Purchase Agreement

The power generated from the project is sold to Saudi Electricity under a power purchase agreement.

Contractors Involved

Arabian Bemco Contracting was selected to render EPC services for the oil fired power project.

Juba Power Plant (Juba Power Plant Unit I) is equipped with AEG KANIS MS6461PG turbines.

Juba Power Plant (Juba Power Plant Unit II) is equipped with AEG KANIS MS6461PG turbines.

Juba Power Plant (Juba Power Plant Unit III) is equipped with AEG KANIS MS6461PG turbines.

Juba Power Plant (Juba Power Plant Unit IV) is equipped with AEG KANIS MS6461PG turbines.

Juba Power Plant (Juba Power Plant Unit IX) is equipped with GE Power MS-5001 turbines.

Juba Power Plant (Juba Power Plant Unit V) is equipped with AEG KANIS MS6461PG turbines.

Juba Power Plant (Juba Power Plant Unit VI) is equipped with AEG KANIS MS6461PG turbines.

Juba Power Plant (Juba Power Plant Unit VII) is equipped with AEG KANIS MS6461PG turbines.

Juba Power Plant (Juba Power Plant Unit VIII) is equipped with GE Power MS-5001 turbines.

AEG KANIS supplied S7195/2 electric generator for the Juba Power Plant (Juba Power Plant Unit I).

AEG KANIS supplied S7195/2 electric generator for the Juba Power Plant (Juba Power Plant Unit II).

AEG KANIS supplied S7195/2 electric generator for the Juba Power Plant (Juba Power Plant Unit III).

AEG KANIS supplied S7195/2 electric generator for the Juba Power Plant (Juba Power Plant Unit IV).

GE Power supplied ATB-2A electric generator for the Juba Power Plant (Juba Power Plant Unit IX).

AEG KANIS supplied S7195/2 electric generator for the Juba Power Plant (Juba Power Plant Unit V).

AEG KANIS supplied S7195/2 electric generator for the Juba Power Plant (Juba Power Plant Unit VI).

AEG KANIS supplied S7195/2 electric generator for the Juba Power Plant (Juba Power Plant Unit VII).

GE Power supplied ATB-2A electric generator for the Juba Power Plant (Juba Power Plant Unit VIII).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.