La Tella is a 50MW onshore wind power project. It is located in Murcia, Spain. The project is currently active. It has been developed in single phase.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 50 | 50 | – | Active | Murcia, Spain | Aldesa Construcciones; Grupo Ascia |
---|
Description
The project was developed by Aldesa Construcciones and Grupo Ascia. The project is currently owned by Northland Power with a stake of 98%.
The project supplies enough clean energy to power 30,000 households, offsetting 84,000t of carbon dioxide emissions (CO2) a year. The project cost is $79.232m.
The project has 78m high towers.
Contractors Involved
Siemens Gamesa Renewable Energy was selected as the turbine supplier for the wind power project. The company provided 25 units of G97-2.0 MW turbines, each with 2MW nameplate capacity.
Aldesa Energias Renovables and Siemens Gamesa Renewable Energy were contracted to render operations & maintenance services for the project.
About Aldesa Construcciones
Aldesa Construcciones SA (Aldesa Construcciones) is a construction company that offers civil engineering and building services. The company’s services include project management, infrastructure construction, and maintenance and preservation services. It also offers construction and upgrading of motorways. Aldesa Construcciones constructs and develops projects such as airports, coastal and water sector works, railway infrastructure, roads and highways, urban development and energy projects, educational institutions, corporate and institutional buildings, shopping centres, hospitals, industrial facilities, and homebuilding and refurbishment projects, among others. The company has its operations in Spain, Mexico, Poland, Peru, Romania, India, Norway, and Luxembourg. Aldesa Construcciones is headquartered in Madrid, Spain.
About Grupo Ascia
Grupo Ascia (GA) is an alternate energy company that designs, operates, and develops production facilities and power stations. The company’s services include renewable energy, petrol filling stations, and engineering and consultancy services and develops renewable energy projects at all stages from inception to implementation. Its engineering and services comprise evaluation, wing engineering, design of wind farms, technical assistance, processing of municipal licenses and authorizations, wind operation, technical and economic advice, certifications and liquidations, and contracts, paperwork and negotiations with suppliers. The company also develops and operates stations and service areas. It has its operations in Spain and Romania. GA is headquartered in Madrid, Spain.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.