Magnolia Combined Cycle Power Plant is a 387.6MW gas fired power project. It is located in California, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in September 2005.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 387.6 | 387.6 | – | Active | California, the US |
---|
Description
The project is currently owned by Southern California Public Power Authority with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant that is used for Baseload.
The project generated 1,531,144MWh of electricity. The project cost is $234m.
Development Status
The project got commissioned in September 2005.
Contractors Involved
Kvaerner North American Construction was selected to render EPC services for the gas fired power project.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of 7F.04 gas turbine with 198.9MW nameplate capacity.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of A-14 steam turbine with 188.7MW nameplate capacity.
GE Power supplied electric generator for the project.
GE Power supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.