Nam Na 2 is a 66MW hydro power project. It is located in Lai Chau, Vietnam. The project is currently active. It has been developed in single phase. The project construction commenced in 2009 and subsequently entered into commercial operation in 2015.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 66 | 66 | – | Active | Lai Chau, Vietnam |
---|
Description
The project is currently owned by Hung Hai Group.
The project generated 254.11 GWh of electricity. The project cost is $68.571m.
The hydro power project consists of 3 turbines, each with 22MW nameplate capacity.
The project has 3 electric generators installed at the site.
Development Status
The project construction commenced in 2009 and subsequently entered into commercial operation in 2015.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.