Napoli Levante Power Plant is a 398MW gas fired power project. It is located in Campania, Italy. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2009.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 398 398 Active Campania, Italy

Description

The project is co-owned by Energia Italiana and Engie Italia, with their respective ownership stake of 50% each.

It is a Combined Cycle Gas Turbine (CCGT) power plant. The fuel is procured from SNAM Rete Gas.

The project cost is $310.46m.

Development Status

The project got commissioned in 2009.

Contractors Involved

Ansaldo Energia was selected to render EPC services for the gas fired power project.

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 steam turbine with 134MW nameplate capacity.

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 gas turbine with 264MW nameplate capacity.

GE Power supplied ATH 170000/2, Hydrogen-Cooled electric generator for the project.

GE Power supplied WY23Z-109LL, Air-Cooled electric generator for the project.

AC Boilers supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.