Nerima Waste To Energy Plant is an 18.7MW biopower project. It is located in Tokyo, Japan. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in November 2015.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 18.7 | 18.7 | – | Active | Tokyo, Japan |
---|
Description
The project cost is $80.217m.
The process of combustion has been adopted in this project to release the stored energy from the feed. Refuse which is a kind of municipal solid waste is used as a feedstock to power the project.
Development Status
The project got commissioned in November 2015.
Contractors Involved
JFE Engineering supplied steam boiler for the project. The temperature witnessed inside the boiler is around 400Degree Celsius. The steam is pressurized inside the boiler at 61bar.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.