Orot Rabin Steam Turbine Power Plant is a 2,590MW coal fired power project. It is located in Haifa, Israel. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 1982.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 2,590 | 2,590 | – | Active | Haifa, Israel |
---|
Description
The project is currently owned by The Israel Electric with a stake of 100%.
It is a steam turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is coal. In case of shortage of coal the plant can also run on Oil. The fuel is procured from National Coal Supply Co. Ltd..
Development Status
The project got commissioned in November 1982.
Contractors Involved
Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit III) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit IV) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit V) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 575MW nameplate capacity.
Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit VI) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 575MW nameplate capacity.
GE Power supplied electric generator for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit I).
Siemens Energy supplied electric generator for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit I).
GE Power supplied electric generator for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit II).
Siemens Energy supplied electric generator for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit II).
GE Power supplied electric generator for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit III).
Siemens Energy supplied electric generator for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit III).
GE Power supplied electric generator for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit IV).
Siemens Energy supplied electric generator for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit IV).
BWXT Canada supplied steam boiler for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit I).
BWXT Canada supplied steam boiler for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit II).
BWXT Canada supplied steam boiler for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit III).
BWXT Canada supplied steam boiler for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit IV).
GE Power supplied steam boiler for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit V).
GE Power supplied steam boiler for the Orot Rabin Steam Turbine Power Plant (Orot Rabin Steam Turbine Power Plant Unit VI).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.