Passo Sao Joao is a 77MW hydro power project. It is located on Ijui river/basin in Rio Grande do Sul, Brazil. The project is currently active. It has been developed in single phase. The project construction commenced in 2007 and subsequently entered into commercial operation in 2012.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 77 77 Active Rio Grande do Sul, Brazil

Description

The project is currently owned by Eletrosul Centrais Eletricas with a stake of 100%.

Passo Sao Joao is a run-of-river project. The project cost is $214.863m.

Development Status

The project construction commenced in 2007 and subsequently entered into commercial operation in 2012.

Contractors Involved

Power Machines was selected as the turbine supplier for the hydro power project. The company provided 2 turbines, each with 38.5MW nameplate capacity.

Power Machines supplied 2 electric generators for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.