PGE Belchatow Power Plant is a 5,472MW coal fired power project. It is located in Lodz, Poland. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1982.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 5,472 | 5,102 | – | Active | Lodz, Poland |
---|
Description
The project is currently owned by PGE Gornictwo i Energetyka Konwencjonalna Spolka Akcyjna with a stake of 100%.
It is a steam turbine power plant. The fuel is procured from belchatow coal mine.
The project generated 32,300,000MWh of electricity.
Development Status
The project got commissioned in 1982.
Contractors Involved
GE Power was selected to render EPC services for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XIII).
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit I) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 370MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit II) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 370MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit III) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 380MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit IV) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 380MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit IX) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 390MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit V) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 380MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit VI) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 394MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit VII) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 390MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit VIII) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 390MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit X) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 390MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XI) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 390MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XII) is equipped with GE Power 18K370 steam turbine. The phase consists of 1 steam turbine with 390MW nameplate capacity.
PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XIII) is equipped with GE Power STF100 steam turbine. The phase consists of 1 steam turbine with 858MW nameplate capacity.
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit I).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit II).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit III).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit IV).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit IX).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit V).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit VI).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit VII).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit VIII).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit X).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XI).
GE Power supplied GTHW-360 electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XII).
GE Power supplied GIGATOP 2-pole electric generator for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XIII).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit I).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit II).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit III).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit IV).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit IX).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit V).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit VI).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit VII).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit VIII).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit X).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XI).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XII).
Rafako supplied steam boiler for the PGE Belchatow Power Plant (PGE Belchatow Power Plant Unit XIII).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.