Pine Tree Acres Landfill Power Project is a 12.8MW biopower project. It is located in Michigan, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in March 2012.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 12.8 12.8 Active Michigan, the US

Description

The project is currently owned by WM Renewable Energy.

The process of landfill has been adopted in this project to release the stored energy from the feed. Landfill gas is used as a feedstock to power the project.

The project consists of 8 engines, each with 1.6MW nameplate capacity.

Development Status

The project got commissioned in March 2012.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.