Pinjarra Power Station is a 280MW gas fired power project. It is located in Western Australia, Australia. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in March 2006.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 280 280 Active Western Australia, Australia

Description

The project is currently owned by Alinta Energy with a stake of 100%.

It is a Gas Turbine with Cogen power plant that is used for Baseload.

The project cost is $462.501m.

Development Status

The project got commissioned in March 2006.

Contractors Involved

Downer EDI Engineering was selected to render EPC services for the gas fired power project.

Mitsubishi Power was selected as the turbine supplier for the Gas fired project. The company provided 2 units of M701DA – 50Hz gas turbines, each with 140MW nameplate capacity.

Mitsubishi Power supplied electric generator for the project.

Alcoa World Alumina Australia is the O&M contractor for thermal power project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.