Desert Claim Wind is a 100MW onshore wind power project. It is planned in Washington, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the dormant stage. It will be developed in a single phase. Buy the profile here.
Description
The project is being developed and currently owned by Desert Claim Wind Power. The company has a stake of 100%.
The project cost is expected to be around $151m.
The wind power project consists of 31 turbines.
The Tubular Steel structure to be installed at the project site are expected to be 80m high.
For more details on Desert Claim Wind, buy the profile here.
About Desert Claim Wind Power
Desert Claim Wind Power LLC (Desert Claim Wind) is a company which generates, transmits, and distributes electric energy. Desert Claim Wind is headquartered in Woodinville, Washington,the US.