Jenariz Wind Farm is a 48MW onshore wind power project. It is planned in Navarre, Spain. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the under construction stage. It will be developed in a single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2023. Buy the profile here.
Description
The project is being developed and currently owned by Alfanar Group. The company has a stake of 100%.
The project cost is expected to be around $69.648m.
Development status
The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2023.
Contractors involved
GE Renewable Energy will be the turbine supplier for the wind power project. The company is expected to supply GE 3.X-4.0 MW model turbines for the project.
GE Renewable Energy is expected to perform operations and maintenance for the wind power project for a period of 15 years.
For more details on Jenariz Wind Farm, buy the profile here.
About Alfanar Group
Alfanar Group (Alfanar) is a provider of electrical construction products and EPC solutions for conventional and renewable power projects. The company offers electrical products such as power distribution and control systems, electrical switches and sockets, cables and wires, transformers, and lighting products. Its power distribution and control systems comprises of wide range of low, medium and high voltage products, metal enclosures, substation automation systems, and medium voltage systems. Alfanar also provides construction and engineering services which include power and water works, project management, electromechanical, civil engineering, testing and commissioning, repair and rewind services, and steel fabrication services. It has operations in Saudi Arabia, India, and the UAE. Alfanar is headquartered in Riyadh, Saudi Arabia.