The Pulah Indah Power Plant is 1,200MW dual-fuel fired power project. It is planned in Selangor, Malaysia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in multiple phases. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in January 2024. Buy the profile here.
Description
The project is being developed by Pulau Indah Power Plant Sdn. Worldwide Holdings and Korea Electric Power are currently owning the project having ownership stake of 75% and 25% respectively.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant can run on dual-fuel. The primary fuel being used to power the plant will be natural gas. In case of shortage of natural gas the plant will run on Distillate Fuel Oil. The fuel will be procured from Petronas Gas Bhd.
The project cost is expected to be around $1,000m.
Development status
The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by January 2024.
Power purchase agreement
The power generated from the project will be sold to Tenaga Nasional under a power purchase agreement.
Contractors involved
Mitsubishi, PEC Powercon Sdn and POSCO Engineering & Construction are expected to render engineering procurement construction services for the dual-fuel fired power project.
Pulah Indah Power Plant (Pulah Indah Power Plant Block I) will be equipped with GE Power 9HA.01 gas turbine. The phase consists of 1 gas turbine.
Pulah Indah Power Plant (Pulah Indah Power Plant Block I) will be equipped with GE Power STF-D650 steam turbine. The phase consists of 1 steam turbine.
Pulah Indah Power Plant (Pulah Indah Power Plant Block II) will be equipped with GE Power 9HA.01 gas turbine. The phase consists of 1 gas turbine.
Pulah Indah Power Plant (Pulah Indah Power Plant Block II) will be equipped with GE Power STF-D650 steam turbine. The phase consists of 1 steam turbine.
GE Power is expected to be the supplier of W88 electric generator for the project.
GE Power is expected to be the supplier of W88 electric generator for the project.
GE Power is expected to be the supplier of W88 electric generator for the project.
GE Power is likely to be the supplier of steam boiler for the project.
GE Power is likely to be the supplier of steam boiler for the project.
GE Power is likely to be the supplier of steam boiler for the project.
GE Power is expected to perform operations and maintenance for thermal power project for a period of 21 years.
For more details on Pulah Indah Power Plant, buy the profile here.