Tocopilla Solar Park is a 227.46MW solar PV power project. It is planned in Antofagasta, Chile. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in 2025. Buy the profile here.
Description
The project is being developed by Eosol Energy and Mytilineos. The project is currently owned by Mytilineos with a stake of 100%.
Tocopilla Solar Park is a ground-mounted solar project which is planned over 2,695 hectares.
The project cost is expected to be around $170m.
Development status
The project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by 2025.
Contractors involved
Canadian Solar will be the supplier of the PV modules for the solar power project. The company is expected to provide 568,650 modules each with 400W of nameplate capacity.
The project will utilise single axis tracker that are likely to be supplied by STI Norland.
For more details on Tocopilla Solar Park, buy the profile here.
About Eosol Energy
Eosol Energy SL (Eosol Energy) is a provider of engineering, design and consulting solutions. It operates through development, engineering, operations and maintenance divisions. The company offers development assistance; asset management; feasibility studies, construction and execution budget monitoring, supervision and other technical support through its development segment. Eosol Energy’s engineering business provides project engineering, construction management, automation and control services. It serves energy, automotive, telecom, building and infrastructure, industrial, aerospace and defense sectors. The company has operational presence in Spain, Egypt, France, the US, Mexico, Chile, Colombia, Morocco, South Africa, and Kuwait, among others. Eosol Energy is headquartered in Pamplona, Navarre, Spain.
About Mytilineos
Mytilineos SA (Mytilineos) is a diversified holding company. The company focuses on business activities, comprising mining and metallurgy; energy; engineering, procurement and construction (EPC), and gas trading. Mining and metallurgy business includes the mining, processing, and supply of aluminum, and bauxite. It operates an aluminum plant in Agios Nikolaos, Viotia, Greece. Through, energy business, Mytilineos carries out the generation and distribution of electricity and supply of natural gas. The company also provides EPC services such as power generation plants, street lighting and training centers, and operation and maintenance services. It also manufactures mechanical and electrical parts for infrastructure and defense projects and other uses. Mytilineos is headquartered in Maroussi, Athens, Greece.